Home / projects / Cornerstone Leamington Village

Cornerstone Leamington Village

  • Date

    2023

  • Builder

    Construction Advantage

  • Category

    Commercial

  • Products Used

    Suites – 40mm Architectural + 125mm Flush Glaze CommercialGlass – Clear Low E Double Glazing, Other – Automatic Sliding Doors and Specialized Ventilation Louvres

This four-storey mixed model development is the first of its kind in Leamington, made up of 30 apartments with seven retail shops on the ground floor. The main contractor, Construction Advantage, approached us to take care of all the windows and doors on a tight turnaround, meaning we were required to manufacture the joinery based off the plans, with no room for error. This called for meticulous attention to detail on a tight timeline, and we managed to deliver the windows and doors before the openings were ready. The result is much-needed accommodation in the heart of Leamington, Cambridge, and retail offering employment opportunities for locals.

building

“Charlie was proactive in scheduling their production so windows were already there by the time we had window openings ready. The team at DuCo are really good at detailing. They’ll come out and give us some guidance before the openings. This job was more than 30 apartments, so it would have meant if we got it wrong once, we would have got it wrong 30 times.”

SAM HILL, CONSTRUCTION ADVANTAGE LTD

building

building

building