Home / projects / Futura Head Office

Futura Head Office

  • Date

    2023

  • Builder

    Aztech Buildings

  • Category

    Commercial

  • Products Used

    Suites – 40mm Architectural + 150mm Flush Glaze Commercial + 100mm Centre Glaze Internals, Glass – Grey Tint + Acoustic Laminate Double Glazing

This state-of-the-art headquarters complex on SHW1, Waikato was completed in 2023. We were commissioned by Aztech & Futura to manufacture and install all exterior and interior windows and doors. The building features a large raking shopfront, and oversized pivot entry doors. The result is an impressive home for the two businesses, complete with office spaces and workshops.

inside building

DuCo delivered what we were looking for, and I was really impressed with what they did for us. It was cost-effective and met the architect’s state-of-the-art design requirements.”

JOSEPH HOYLE, FUTURA

inside building

inside building